Permits, construction and fuel supply for service stations in El Salvador

For landowners who want to open a station. We file the permits with eight institutions and the Environmental Impact Study. We build the station and arrange the contract with the fuel company.

See the full processTalk to us

From idea to result

You bring the land. We handle the rest.

  1. 01Understand

    We start with the site. Where it is, what you want to build, the budget and the deadline.

  2. 02Connect

    We identify the specialists, the institutions and the resources the project is going to need.

  3. 03Create

    We produce the signed and sealed drawings, the hydrological study and the Environmental Impact Study.

  4. 04Manage

    We file each application, coordinate the specialists and follow it up institution by institution.

  5. 05Resolve

    When an institution comes back with observations, we answer them until the file clears.

  6. 06Advance

    The goal was never the file. It is the project moving.

The process, in four phases

First, the DOT confirms what can be built. Then eight institutions review the project. Then comes the Environmental Impact Study. The MARN resolution alone takes about four months.

01Previous procedures02Institutional feasibilities03Environmental file04Construction and occupancyEach phase opens the nextMARN resolutionCBESMINECANDAMinistry of HealthAlcaldíaMinistry of LaborUtilityMIDES8 institutions at the same timeThe longest phase6 months from the start orderPhase durations are approximate

See every permit and the documents it needs

Stations in Osicala and Zacatecoluca

Estación de Servicio Expres Mart & Gass

Osicala, Morazán · June 2026

A station on the Ruta de Paz highway. Complete hydraulic and hydrocarbon drawing sets. They cover the stormwater network, cistern, grease trap, septic tank and absorption wells.

Estación de Servicio Expres Mart & Gass

Estación de Servicio Zacatecoluca

Zacatecoluca, La Paz · From November 2025

Full environmental permitting. It covers design, feasibilities, the hydrological study and the Environmental Impact Study through to the MARN resolution. Six-month term.

Estación de Servicio Zacatecoluca

See the detail on each project

Have a site?

Write with the location and what you want to build. We will tell you which permits it needs and how long they take.

Talk to usWhatsApp +503 7469-6498